Factory directly Steel Rebar Mesh Machine - Reinforcing Mesh Welding Machine – Jiake
Factory directly Steel Rebar Mesh Machine - Reinforcing Mesh Welding Machine – Jiake Detail:
1.Technical Parameter:
Model | DP-FP-2500A+ | DP-FP-3000A+ | DP-GW-2500A |
Wire diameter | 3-8mm | 3-8mm | 5-12mm |
Welding width | Max.2500mm | Max.3000mm | Max.2500mm |
Longitude wire space | 100-300mm | ||
Cross wire space | Min.50mm | ||
Mesh length | Max.12000mm | ||
Wire feeding way | Pre-straightened & pre-cut | ||
Welding speed | 80-100 times/min | 80-100 times/min | 80-100 times/min |
Welding electrodes | Max.24pcs | Max.30pcs | Max.24pcs |
Welding transformers | 150kva*6pcs | 150kva*8pcs | 150kva*12pcs |
Machine size | 8.4*3.4*1.6m | 8.4*3.9*1.6m | 8.4*5.5*2.1m |
Weight | 5.2T | 6.2T | 8.5T |
2.YouTube Video
3.Superiorities of welded mesh production line
●Panasonic, Schneider, ABB, SMC, Igus electric components.
●Touch screen interface.
●Pre-straightened & pre-cut wires.
●PLC control of cross wire space adjustment and welding current adjustment.
●Panasonic servo motor for mesh pulling.
●Pure welding electrodes, 30*30*30mm (3-8mm), 30*30*50mm (5-12mm).
●Cooling system: cast water-cooling transformer and lower welding electrode base.
●Brake motor & reducer connect the principal axis directly.
●Wire pre-load system.
4.Finished Rolled Mesh
Reinforcement mesh welding machine is used to make steel rebar mesh, road mesh, building construction mesh etc.
Contact us, we will make professional solution according to your needs and budget;
Product detail pictures:



Related Product Guide:
We stick to our enterprise spirit of Quality, Performance, Innovation and Integrity. We purpose to create a lot more price for our prospects with our rich resources, innovative machinery, experienced workers and great products and services for Factory directly Steel Rebar Mesh Machine - Reinforcing Mesh Welding Machine – Jiake , The product will supply to all over the world, such as: Zimbabwe, Japan, Botswana, In order to meet more market demands and long-term development, a 150, 000-square-meter new factory is under construction, which will be put into use in 2014. Then, we shall own a large capacity of producing. Of course, we will continue improving the service system to meet the requirements of customers, bringing health, happiness and beauty to everyone.

We are a small company that has just started, but we get the company leader's attention and gave us a lot of help. Hope we can make progress together!
